Build yours →

Stations

Nomad Mobile cart stationCaravan Carry-on stationTango Flight case station

Engines

Mac Studio M5 UltraMacBook Pro 16" M5 Max

More

Tools Free for DITsWorkflowUpload 10 GbpsOn set DIT in BarcelonaContact

Free tool // Storage

How many TB does the shoot need?

Pick the camera, the codec and the frame rate, add the hours you roll a day, the days and the cameras. You get the terabytes for every copy and how long the offload takes, from the manufacturers' own data rates.

En español ↗
Frame rate
Rolling per day
Copies
Offload speed

Storage to buy for the whole shoot

0TB

Data rate
MB/s
Per minute
GB
Per hour, 1 camera
TB
Per shoot day, all cameras
TB
Whole shoot, 1 copy
TB
Offload per day

Decimal units (1 TB = 1,000 GB), as drives are labelled. Offload time assumes the copies are written in parallel. Data rate source ↗

The other way round

How much fits on 1 TB?

Same camera, codec and frame rate as above. Decimal units, as drives are labelled; formatting leaves a little less.

Recording time, 1 camera
All cameras and copies
Shoot days at your rolling time

Quick answers

Where do the data rates come from?

From each manufacturer's own specifications, manuals and data rate tables. Every format links to the page it was taken from. When a brand only publishes a rate for one frame rate, the calculator scales it with the frame rate, because RAW and intra-frame codecs store a fixed size per frame.

Why 3 copies?

The usual rule on set: a master and two backups, on different drives, with one of them leaving the set every day. Change it to 2 if production signs off on a single backup.

Why does my drive show less than the calculator says?

Drives are sold in decimal terabytes (1 TB = 1,000 GB) and the calculator uses the same units. Windows shows binary units, so an 8 TB drive appears as about 7.3 TB there. Leave 10 to 20% free on every drive anyway.

How much do I really roll per day?

It depends on the job. As a rough start: commercials and music videos often roll 1 to 3 hours per camera, fiction 2 to 4, documentaries and live events much more. Check with the script supervisor after the first day and adjust.

Made by Adrian Alescio, DIT in Barcelona. Free tools, no sign-up, built for the set.